Check Your Prior Approval Route Before Work Begins

Planning advice, drawings and application support for qualifying permitted development.

Some permitted development rights require a prior approval process before the proposal can proceed. Planning By Design helps assess eligibility, identify the matters the council can consider and prepare the agreed application documents.

Prior Approval Is a Specific Planning Route

Check Eligibility First

The proposal must satisfy the relevant permitted development right, including its limits and conditions. The property, planning history and any restrictions can affect the route.

Address the Required Matters

The matters for prior approval depend on the particular right. The application should address those requirements with accurate drawings and supporting information.

This page describes the system in England. Rules vary across the UK, so advice must reflect the location. Prior approval is different from council pre-application advice and a full planning application.

Chartered Town Planners

Professional planning advice for your project.

Planning + Design

Architects and town planners working together.

UK Projects

Advice tailored to the site and local context.

Clear Scope

Know the services included in your quotation.

Proposals That May Have a Prior Approval Route

These are examples to assess, not a promise that a particular property qualifies.

Larger Rear House Extensions

Some qualifying larger single-storey rear extensions follow a neighbour consultation process. The size, original house and other limits need checking before relying on the route.

Commercial Premises to Homes

Certain changes from commercial use to residential accommodation may qualify. Eligibility, restrictions and the specific residential standards and assessment requirements must be reviewed.

Agricultural Buildings

Some agricultural development or qualifying building conversions have permitted development routes with prior approval requirements. The building, land use and proposed works matter.

Other Qualifying Development

Some additional storeys and other defined development types have specific routes. We can assess whether the relevant right applies to your actual proposal.

Understand the Route Before Investing in Detailed Design

Our Planning Appraisal can examine the building, planning history, proposed use or works and relevant restrictions. We explain whether prior approval appears suitable, what information is needed and whether a different application should be considered.

Planning Appraisal effectively becomes FREE if you proceed with any further Planning By Design service.

The appraisal fee is deducted from your quote/invoice, including if you proceed with drawings only.

What Can the Application Require?

Plans & Elevations

Drawings defining the site, existing building and proposal, with the dimensions and information required for the relevant route.

Eligibility Information

Evidence addressing the particular permitted development right, such as existing use, building history or other qualifying facts where relevant.

Specialist Reports

Depending on the right and site, matters such as transport, flooding, contamination, noise or natural light may need specialist input. The required reports are confirmed for the project.

Prior Approval, Planning Permission or an LDC?

Planning conditions, Article 4 directions and protected sites or buildings may affect available rights. Building Regulations and other relevant consents remain separate.

Read the GOV.UK guidance on permitted development and prior approval →

How Our Prior Approval Service Works

1

Share the Building and Proposal

Send the address, photographs, existing plans, planning decisions and a clear description of the intended works or use.

2

Assess the Relevant Right

Review eligibility and restrictions, and identify the specific matters and documents for the application.

3

Prepare the Documents

Prepare the agreed drawings and supporting information. Obtain separately scoped specialist reports where required.

4

Review & Submit

You approve the documents before submission. We liaise with the authority within our agreed appointment.

5

Confirm the Position Before Starting

Review the outcome, conditions and relevant timing requirements. Confirm the approved details and other necessary permissions before work begins.

Prior Approval Timescales & Costs

How Long Will It Take?

Preparation depends on the drawings, evidence and any reports; specialist input can take weeks or months. Council time limits vary by the permitted development right. There is no single deadline or automatic approval rule that applies to every prior approval application.

GET A FREE CONSULTATION

How Much Will It Cost?

Fees depend on the development type, drawings and supporting work. We identify our services, application fees and separately commissioned reports in the quotation. Use the calculator for an initial estimate and contact us for a project-specific scope. Our Price Match Guarantee applies to genuine like-for-like quotations.

TRY OUR COST CALCULATOR

Do Not Assume You Can Start While Waiting

The relevant right sets out when development may proceed. Some routes include a provision for the authority not deciding within a specified period; others require a different next step. Eligibility and all applicable conditions still matter.

Do not treat silence from the council as universal permission. Nor should prior approval be assumed to be available retrospectively once the work or use has begun. If your project has already started, tell us at first contact so the position can be assessed.

Prior Approval Project: Commercial Space to Homes

Proposed floor plans and elevations for conversion of upper commercial floors to residential accommodation

Prior Approval: Commercial to Residential

The client proposed converting the upper floors of commercial premises into two flats while retaining the commercial ground floor. Following an appraisal, our team identified a prior approval route.

Our architectural team prepared drawings and our planners prepared the supporting Planning Statement. The documents were submitted with the client’s approval. The published case records the council’s confirmation that the proposed change of use was lawful.

View the project and drawings →

Why Choose Planning By Design?

Eligibility Before Submission

Assess the relevant right and restrictions before relying on the route.

Coordinated Planning and Design

Develop the drawings alongside the planning requirements.

Focused Supporting Information

Address the matters relevant to the particular prior approval process.

Clear Specialist Scope

Identify reports and external input needed for the site.

Practical Next Steps

Understand the outcome and conditions before progressing.

Transparent Advice

We explain uncertainty and do not guarantee approval.

Prior Approval FAQs

What is prior approval?

It is a process required by certain permitted development rights, allowing the authority to assess specified matters before development proceeds. The requirements depend on the particular right.

Is it the same as pre-application advice?

No. Pre-application advice is advice about a proposal. Prior approval is a formal process attached to a particular permitted development right.

Does every permitted development project need prior approval?

No. Some rights require it and others do not. The applicable right, conditions and property restrictions need checking.

Can any commercial building be converted to housing this way?

No. The use, building, location and detailed qualifying requirements matter. A prior approval route should not be assumed from the property’s marketing description.

Can neighbours comment?

Consultation requirements depend on the relevant route. Where comments are invited, the decision must still relate to the matters that can lawfully be considered.

How long does the council have to decide?

The relevant permitted development right sets the timetable. Different routes have different requirements, so confirm the period and its starting point for your application.

Can I start if the council has not replied?

Only if the specific route permits this and every relevant requirement is met. Silence is not a universal approval rule. Check the position before starting work.

Can I apply after completing the development?

Do not assume prior approval can be obtained retrospectively. Send details of any work or use already started so the appropriate planning route can be assessed.

Do I still need Building Regulations approval?

Where Building Regulations apply, they remain separate from prior approval. Technical drawings, structural information and any other approvals should be scoped before construction.

What happens if prior approval is refused?

Review the reasons and eligibility position. A revised scheme, appeal or full planning application may be considered where appropriate; no alternative route is automatically successful.