I Have My Architectural Drawings
Send your latest plans, any planning decision and the details of what you intend to build. We can review the information and prepare a quotation for the technical drawing work.
Turn your agreed design into detailed technical drawings for the next stage of your project.
From wall and roof build-ups to insulation and key junctions, our technical drawings explain how your proposed building is put together. We develop the details and specifications around your design and the information needed for building control.
Start with the drawings and approvals you already have.
Send your latest plans, any planning decision and the details of what you intend to build. We can review the information and prepare a quotation for the technical drawing work.
The technical package needs to follow the agreed design. If the layout or planning position is still changing, discuss the sequence with us before commissioning detailed work.
Drawings tailored to your project.
Architecture, planning and engineering.
Know what your quotation includes.
Understand what happens after your drawings.
Two different parts of preparing your project.
Deals with whether the proposed development is acceptable in planning terms, including its use, scale and effect on its surroundings.
Concern the technical standards that apply to the building work. Planning permission does not replace the separate building control process.
Check both routes for your project. Explore Permitted Development.
The package is tailored to your building and the work you plan to carry out.
Drawings showing the proposed arrangement, dimensions, levels and relationships between the building elements.
Wall, floor and roof build-ups, junctions and other details that communicate the intended construction approach.
Notes on relevant materials and performance requirements, including insulation, moisture protection and ventilation where applicable.
Information that needs to be read alongside structural calculations and other specialist designs. Required inputs and responsibilities are identified for your project.
Check the requirements before building work starts.
Extensions, conversions and structural alterations can involve Building Regulations. Some smaller works also fall within the rules, while exemptions or competent person schemes may apply. The route depends on the work and its location.
Tell us what you are changing, where the property is and what drawings you have. If approval requirements are unclear, confirm them with the relevant building control body.
Approval systems differ across the UK. The application guidance below refers to England; confirm the applicable process for projects in Wales, Scotland or Northern Ireland.
Building control charges, structural engineering, surveys and specialist assessments may be separate. Check what is included before proceeding.
Share the current design, planning documents where relevant, property details and your intended programme.
Agree the deliverables, fee and programme before drawing work begins.
We develop your architectural design into technical drawings and construction details.
Check the drawings with our team and bring together the relevant engineering and specialist information.
Follow the applicable submission and inspection process, with responsibilities confirmed before work starts.
Drawing preparation depends on the size and complexity of the project, the information available and the specialist input required.
Tell us your intended start date. We will discuss a programme for the drawing work; building control review and site inspections are separate stages.
Fees depend on the technical detail and coordination required. A smaller, complex alteration can need more design work than a larger, simpler project.
We need to review your architectural plans before we can provide a quotation for Building Regulations drawings. Send us your plans to request a project-specific quote.
In England, most projects use local authority building control or a registered building control approver. Higher-risk buildings follow a separate Building Safety Regulator process. Read the official application guidance.
Explore the technical detail behind a building project.
This sample includes existing and proposed plans and elevations, a building section, construction details and a structural summary.
This is a project example, not a specification to reuse for another building. Your drawings must reflect your project, site conditions and applicable requirements.
Beams, load-bearing openings, foundations and other structural work may need an engineer’s calculations and specifications. These should be coordinated with the technical drawings.
A changed layout, unexpected site condition or revised structural solution may affect the package. Keep your designer, engineer and builder informed so the documents remain consistent.
Where planning permission is needed, resolving the design and planning outcome before detailed technical work can help avoid paying for repeated revisions.
Bring the architectural proposal and its technical requirements into the same conversation.
Details tailored to your building, its layout and construction.
Connect structural calculations with the details shown in your drawings.
Understand what information is needed and what happens after the drawings are prepared.
Agree deliverables and separate costs before commissioning the work.
Carry your architectural design through to the technical drawing stage.
They are technical plans, sections, details and specifications developed for the relevant building work. They provide more construction-related information than drawings prepared only to explain a planning proposal.
Do not assume so. Ask what technical drawings, engineering information and specialist details are needed for the work. Confirm the intended use and limitations of each drawing package.
Send the latest drawings for review. We will assess whether they contain enough information and whether further measurements, surveys or editable files are needed.
Where permission is required, it is usually sensible to resolve the planning design before commissioning detailed technical drawings. If stages need to overlap, discuss the risk of revisions and additional fees.
Potentially, yes. Permitted Development concerns the planning route. Building Regulations requirements must be checked separately.
They are a distinct specialist service. Your quotation should confirm whether structural engineering is included or needs a separate appointment.
No. The building control body assesses the submission and may request further details or changes. Compliance also depends on the work carried out on site.
Tell us straight away what has been built and what approvals or inspection records exist. Contact local authority building control about any retrospective route; additional investigations or remedial work may be needed.
Send your site address, current architectural plans, planning decision and conditions where relevant, any engineering information, photographs and a short explanation of the work and timescale.
Planning updates, guidance and answers from Planning By Design.
Head of Town Planning, Planning By Design
Send us your design and tell us what you plan to build. We will help you identify the technical drawing work and next steps.