Change of Use
ApprovedLawful Development Certificate

Change of Use From Single Dwelling House (C3) to a Small HMO (C4)

The client approached Planning By Design regarding the proposed change of use from single dwelling house (C3) to a small HMO (6 proposed occupiers) (C4).

Following a planning appraisal with one of our chartered town planners, it was determined that the project was feasible and potentially permitted development via the submission of an application for a Lawful Development Certificate.

One of our chartered architects produced the required architect drawings, which the client approved. Following approval of the architect design one of our chartered town planners has prepared the required Design and Access Statement to justify why the application should be approved. With the client's approval, the architect drawings, Design and Access Statement were submitted with an application for full planning permission.

Planning Permission has now been approved for change of use from single dwelling house (C3) to a small HMO (C4).

Drawings & Planning Documents

“Donec id elit non mi porta gravida at eget metus. Vivamus mollis est non commodo luctus, nisi erat porttitor ligula, eget lacinia odio sem nec elit. Duis mollis porta est non commodo luctus.”

Diane R. Barto

Sales engineer