Project Type

Architect Drawings and Planning Permission for Change of Use From 5- Bedroom HMO (C4) to a Residential Children’s Home (C2)
11/12/2025

Change of Use From 5- Bedroom HMO (C4) to a Residential Children’s Home (C2)

The client approached Planning By Design regarding the proposed change of use from 5 bedroom HMO (C4) to a residential children’s home…

Read More…

Discharge of Conditions For Approved Change of Use From C3 (Dwellinghouse) to C4 (Small HMO – 5 Persons)

Discharge of Conditions For Approved Change of Use From C3 (Dwellinghouse) to C4 (Small HMO – 5 Persons)

Following planning approval subject to conditions, the client contacted Planning By Design to discharge Conditions 3 (Bin Storage) and 4 (Cycle Storage)…

Read More…

Architect Drawings and Lawful Development Certificate for First Floor Rear Extension
10/12/2025

First Floor Rear Extension

The client contacted Planning By Design regarding a proposed first floor rear extension. Following a planning appraisal with one of our chartered…

Read More…

Architect Drawings and Planning Permission for French Doors, Juliet Balcony, Porch and Stairwell
09/12/2025

French Doors, Juliet Balcony, Porch and Stairwell

The client contacted Planning By Design regarding proposed various alterations to fenestration at the property and other minor external alterations.  At the…

Read More…

Architect Drawings and Planning Permission for Conversion of Detached Garage to Ancillary Annex
08/12/2025

Conversion of Detached Garage to Ancillary Annex

The client contacted Planning By Design regarding a proposed conversion of a detached garage to an ancillary annex. Following a planning appraisal with…

Read More…

Architect Drawings and Retrospective Planning Permission for Retention of External Boiler

Retention of External Boiler

The client contacted Planning By Design regarding retrospective planning permission for the retention an external oil-fired boiler, located at ground-floor level on the…

Read More…