Full Planning Permission

Architect Drawings and Planning Permission for Change of Use From Change of Use From Residential Dwelling (C3) to Small Bespoke Children's Home (C2)
14/01/2026

Change of Use From Residential Dwelling (C3) to Small Bespoke Children’s Home (C2)

The client approached Planning By Design regarding the proposed change of use from a residential dwelling (C3) to a small, bespoke children’s…

Read More…

Architect Drawings and Planning Permission for Change of Use From Residential to Equestrian and Construction of a Stable
13/01/2026

Change of Use From Residential to Equestrian and Construction of a Stable

The client approached Planning By Design regarding the proposed change of use from residential to equestrian and construction of a stable on…

Read More…

Architect Drawings and Planning Permission for Single-Storey Rear Extension and Rear Dormer Loft Conversion
07/01/2026

Single-Storey Rear Extension and Rear Dormer Loft Conversion

The client contacted Planning By Design regarding the proposed single-storey rear extension and rear dormer loft conversion.  Following a planning appraisal with one…

Read More…

Architect Drawings and Planning Permission for Change of Use To Place of Worship

Change of Use To Place of Worship

The client approached Planning By Design regarding the proposed change of use of the site’s second floor so it can be used as…

Read More…

Architect Drawings and Planning Permission for a Change of Use From a Dwelling House to One Maisonette and One Self Contained Flat
05/01/2026

Change of Use From a Dwelling House to One Maisonette and One Self Contained Flat

The client approached Planning By Design regarding a proposed change of use from a dwelling house to 1 maisonette and 1 self…

Read More…

Architect Drawings and Planning Permission for Dropped Kerb to Enable Access to Existing EV Charging Infrastructure
17/12/2025

Dropped Kerb to Enable Access to Existing EV Charging Infrastructure

The client approached Planning By Design regarding a proposed creation of a dropped kerb to enable access to existing EV charging infrastructure….

Read More…